Monthly Archives: March 2015

Spring Spruce-up at the Villa

25 March 2015

As I stated in my post from last week, we’re headed into a lull period as far as having guests at the villa. Right now, we have a 1-weeker booked in April and May each. Then, June and July are unusually heavily booked, including a wedding and party on the premises in June – expecting around 200 folks. That should be fun.

So we’re using these open weeks to do a little spring cleaning, sprucing up, general preventive maintenance, and basic villa TLC.Painting Walls 01

These projects include (but not limited to) pressure washing all the patios and decks like we did last September, painting and touching up the patio walls, replacing worn or torn sliding screen door screens, fixing broken slats in louvered window and door shades, painting wooden porch rails, doing a major cleaning of the propane BBQ grill, and fixing various little items that were broken by guests … to name a few.

patching loose rocks 04One item that was no one’s fault was replacing several stones that fell out of a rock-faced wall near where we store the chaise lounge cushions just inside the giant doors to the pool area. Who knows why they fell out … maybe from one of the many small earthquakes that occur here on a fairly regular basis. Usually in the 2.5 to 4.0 range. Depending on where they occur in the ocean, you will feel them sometimes.

Our owners are coming in for a couple of weeks the first part of April (much needed break from their other business in New Orleans) and they have scheduled to have our pool completely resurfaced while they are here. It has been 10 years since it was last done so it is due. So, we’ll have a bright, clean and sparkling, like-new pool in a few weeks. I plan to document the project so stayed tuned.

A Job for a Professional

18 March 2015

Well, our really busy season is about over. High season in the USVIs is winding down. We have had guests in the villa almost every week and day since mid-January. A wedding party departed this past Tuesday so we’re in a little lull now until mid-April

Time to get a few projects knocked out.

Right before the last group arrived, we had an open weekend and I decided to clear some weeds that were growing up a water pipe on the south wall of the villa – the fresh water cistern outside wall. Evidently, I pulled too hard and the pipe broke right where it entered the wall and a little water came out of the break. Unbeknownst to me at the time, this was the main fresh water outflow pipe for the entire villa. OOPS!  We discovered this fact quickly when we realized we had no water flowing in the villa.

Luckily, the wedding party group was not arriving until the following Thursday so we had a few days to get this broken water line fixed. Sunday evening I decided to call in a professional who has done some work around the villa in past years – Joey Ledee. Second generation plumber family on St Thomas. Great reputation.

Joey showed up on time Tuesday morning and had the issue resolved and totally fixed in an hour. Yeah Joey! I probably could have done it but it would have taken me 3-4 hours between going to get parts needed and not having the right tools for the job. And a lot of frustration.

Richard’s Rule: Know when a project is above your pay grade and call in a professional.