Monthly Archives: October 2014

The Pergola Project – Part II

24 October 2014

Pergola 08

The start

Note: I’m about 1.5 weeks behind on posting. I apologize.

I started painting the Pergola on Monday, October 06. I finished Friday, October 10. It didn’t take 5 days, all day. I painted some each of those days. It was hot. It was humid. I was sweating like a pig. I took a lot of breaks. I drank lots of water. I took lots of swim breaks.

Pergola 07Actually, I got the painting of the white slats done by Thursday mid-morning. Just time-consuming work getting between all of those slats and looking up into the sky and sun – it was tiring work (I know, cry me a river – boo-hoo). But damn, it looks good once it was done!

Then I had to work on the rusted areas of the steel beams holding all of Pergola 04the slats up. Here, you have to scrap and pick and pull the old rusted painted areas and then coat them again with a rust inhibitor product. This product turns the rust black and prepares it to be painted. It had to dry overnight.

Friday morning was “paint the steel beams day” and the day we end this project – yeah! Had this done by lunch and had a celebatory beer and swim in the pool.

2 purple orcids oct 2014The Pergola area looks nice and clean now and ready for guests. Plus, the orchids now have a pretty place to bloom.

Guests in for a week and then a couple of more weeks of small projects before more guests arrive in early November.  Updates coming soon.

Pergola Project Completed!

Pergola Project Completed!

The Pergola Project – Part I

10 October 2014

Pergola Rot Repair 02The Pergola project has been staring us in the face for some time. It got delayed a bit when we discovered a fairly large rotten area in one of the Pergola’s large wooden beams. Of course, this rotten area had to be properly repaired before we could pressure wash and then paint.

Pergola 11Going into last weekend, the wood repair was completed and finally dry. Tme to pressure wash the entire Pergola. Sharon is the pressure washing Queen. I think she likes doing it. Plus, since she had to shoot up to get the Pergola beams, she got soaking wet. Not a bad thing in 90°+ weather.

Once she finished the Pergola (old paint chips went everywhere), we cleaned the outdoor wrought iron furniture and some dirty areas around the pool patio.

Screens Clean 02Then, Sharon decided to see if she could clean the big rollup screens along the pool without damaging them. She tested and it worked. So she got all five of the big screens nice and clean. Not often you can pressure wash from the inside of your home.

The last area we needed to pressure wash was the front entrance patio and some really dirty areas on the driveway. Guests are coming this weekend so we want it to look nice and clean. And it now does.

So another project week in the books and the Pergola is ready to be painted. I’ll cover that project in my next post.