Monthly Archives: February 2015

And the Rain Came Pouring Down

17 February 2015

Somewhere on the island, from a news report.

Somewhere on the island, from a news report.

We have never experienced an 11+ inch rain event in less than a 24 hour period. And according to the owners of the villa, neither have they. Not even during the many hurricanes they have been through here on STT. Sharon and I can now say we have. Last Friday night and Saturday morning it rained, and rained, and rained. But we did sleep good – LOL.

From a news report on the event:

St. Thomas was lashed by 11 inches of rain in the 24-hour period between 8 a.m. Friday and 8 a.m. Saturday, with most of that falling after 6 p.m. Friday, National Weather Service meteorologist Jose Alamo said Saturday morning.

“An old frontal boundary has an area of increased convection,” Alamo said from San Juan. According to Alamo, the convection sat over St. Thomas. “That’s why St. Thomas got a lot of rain but no one else did,” Alamo said.

We awoke knowing we needed to get up to the villa and inspect for any damage or flooding. Guests had departed the day before and a full house – 10 people, 5 bedrooms – were to start arriving at around 3 pm. We needed to get the villa cleaned and “Show Ready.”

When we inspected a lower bedroom that has a wall below grade, we found our worse fear. The entire bedroom’s hardwood floors were covered with about 1/4″ of water. The shower and toilet area is a few steps above the bed area. There was water coming down the steps like a waterfall.

Our first thought was this was not flooding but obviously a pipe had busted. Wrong. On further inspection, we found water pouring through the hole in the wall behind the toilet where the cold water supply line comes into the room. Totally ground water seepage. Unbelievable. You could literally see the water flowing through the hole. And it was still raining outside. This was around 8 am. Six hours to “Showtime!”

While Sharon started cleaning the villa I started sucking up water in this bedroom with a shop vac. It took about 2 hours to get this room in presentable shape. Once I completed this task, I went up to the main villa and helped Sharon finish cleaning the main villa was she had already completed the bedrooms that needed cleaning.

It was a tight schedule between two separate guest parties and the flooding didn’t make it any easier. But we got it done with not much time to spare.

Just another day in the life of a Working Couple as caretakers and hosts of a villa in Paradise!

Green Goes To Blue

06 February 2015

Since my last post, we had an open week before we start a very busy, back-to-back-to-back-to-back-to-back booking schedule. Our busiest block of bookings since we arrived back in July 2014. No complaints here. We are “Show Ready.”

One last project we knocked out before guests started arriving on 27 Jan was the repainting of BR 2 bathroom. This is a project that the lady owner requested we add to our project list when she was here during DEC. Just needed some freshening up. And she told us to pick the color …. pull something from the rug. OK …. will do.

Sharon is a very good painter and color-picker and we usually do painting projects together on weekends. But because we were sort of in a time crunch on this one, I did the painting by myself. I spread the paint work out over two days and then the two of us did the cleanup the following weekend.

The only thing remaining to do on this bathroom project is to find a full-length mirror to go on the wall beside the makeup table. We’ve been looking on island but the selection isn’t great. Who knows when or where we will find one but we eventually will.

Do you like the color?